Paul's quoting 2-3 weeks for 30 over pistons and heaven knows when Coy will come across with the 25 over.
Mike wants 2 weeks to put it back together "properly" , and then I've got to fix the stereo, get the bodywork done, the driver's seat bolster repaired and break the engine in.
At least the suspension, Transmission and brake work's done.
Maybe by the 4th anniversary of the original damage (July4) it'll be done! I hope, I hope.
Thanks for the compliment. I think it's gonna LOOK purdy and be a very good all-around performer. It might make as much as 370-380 HP/420-430 lb/ft at the flywheel. Hey I can daydream can't I?
Lee
BTW: I had some custom floor mats made - "Lee's Thunderbird SC".