sizemoremk
Registered User
Hey guys, I have read the posts on removing the triangle, and raising the roof, but I am now wondering of the floor can be dropped?
I would rather drop the floor, that way it still looks stock, and might would be easier to weld that way...
Is it bad to have the floor below the ports?
How much clearance is there between the bottom and the valvetrain? Looks like plenty to me, and if the bottom is thermal coated, does the splash pan need to be used?
Dave won't let me remove the triangle, but I would like to get a little more volume out of this thing somehow....
Thanks!
I would rather drop the floor, that way it still looks stock, and might would be easier to weld that way...
Is it bad to have the floor below the ports?
How much clearance is there between the bottom and the valvetrain? Looks like plenty to me, and if the bottom is thermal coated, does the splash pan need to be used?
Dave won't let me remove the triangle, but I would like to get a little more volume out of this thing somehow....
Thanks!
Last edited: